Basic Description
Outfitted
with the zero leak bidirectional checking sole-noid valves, this power unit is designed to the operation of two independent circuits. Which are respectively to the major and subordinate platforms on the double scissors lift. Two cut-off valves are applied for reducing the machine manually in situation of electrical power loss. If far more independent circuits are essential to your application please speak to us for availability.
Remark: one. Please seek advice from our sales engineer to the different pump displacement, motor power or tank capability.
two. CSA or UL licensed motors can be found on request.
Distinctive Notes
1. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned before installation of the electrical power unit.
3. Viscosity of your oil shoud be 15~46 cst,as well as the oil really should be clean and no cost of impurities,N46 hydraulic oil is encouraged.
four. The energy unit should really be mounted vertically.
five. Check the oil level during the tank following the preliminary running in the electrical power unit.
six. Oil altering is required right after the original one hundred operation hours,afterwards as soon as just about every 3000 hours.
Power UNITS FOR DOUBLE-SCISSORS LIFT
Tags: